Views: 0 Author: Site Editor Publish Time: 2024-10-31 Origin: Site
The day before the container arrived, our engineers had arrived in Hungary and made preparations for the installation.
This is a blow molding project for laundry detergent, a double station double die head blow molding machine, mold with auto deflashing, fully automatic production process, including finished product delivery, bottle leak tester, waste edge delivery to the crusher, etc.
Now is the third day of the installation work, our engineers have installed the overall layout, and everything is in full swing.
The customer is very happy to receive the goods within the agreed time and hopes to start production as soon as possible. We sincerely wish him all the best.